Casing Drilling Operation Overview

Many people don’t have any idea about the casing drilling therefore I would like to share the casing drilling operation VDO.

This video demonstrates the overall casing drilling operation. The steps of the casing drilling operation are as follows:

5-casing-drilling-operationv2

1. Drill down one joint of casing
2. Latch the next casing joint from the V-door
3. Set Hydraulic slips to support casing string
4. Deflate a packer at the special fill up tool
5. Pick up another joint of casing
6. Stab the casing joint into the casing string which is set with the hydraulic slips at the rotary table
7. Lower the special fill up tool and set the packer inside the casing.
8. Make up casing
9. Drill ahead

If you cannot see it, please follow this link http://youtu.be/iYrLrmzCdcc

I wish this VDO would give you better idea on how the casing drilling works.
Note: this casing drilling is the product of Tesco Company.

Related Post

Offshore Deepwater Drilling and Completion in 5 Mi... This is excellent oilfield footage about the overall process of offshore deepwater drilling and completion. It has about 5 minutes with good animation...
Basic Understanding about 3D Seismic for Petroleum... 3D seismic is one of the most important techniques to help geologists and engineers to find out where possible hydrocarbon is below thousands of feet ...
Drill Pipe Pressure Schedule Calculation for Wait ... This example demonstrates how to determine drill pipe pressure schedule for wait and weight method.   Well Information Current mud weigh...
Kill The Blow Out Well Using Nuclear Bomb We've found this vidoe on Youtube and this is one of the most interesting stories of well control. This is about how to kill the blow out well using a...
Share the joy
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.
Tagged , , . Bookmark the permalink.

2 Responses to Casing Drilling Operation Overview

  1. Angel Btavo Peña says:

    Es una herramienta muy eficiente cuando se tiene la bandeja elevadora hidraulica el sistema decirculacion filla tool el sistema de ict el stand master para la aliniacion del casig todo es muy bueno se podra realizar la cementacion con la misma herramienta sin utilizar la cabeza para el proceso de.la cementacion.

  2. Johnny Smith says:

    That’s great.I worked in building 17 as a machinist at Schlumberger when casing drilling was in the same building, and did a lot of the replacement subs for them but never saw the tool in action. I still make replacement sub, but not as the employee I am self employed.