Cement Transition Period in The Oil Well Can Cause Well Control Situation

When cement is in transition period (forming the bond), you will lose some hydrostatic pressure because cement becomes solid phase therefore water in the cement will provide hydrostatic pressure. In many cases happened, there is no issue while performing the cement job however once the cement is set after period of time, there is a casing pressure indicating that there is hydrocarbon in the annulus.

This example will demonstrate you why the well is in underbalance condition while waiting on cement.

Well information: Previous 9-5/8” casing shoe at 4000’ ft.

The vertical well (8.5” hole) is drilled to TD at 10,000ft with 12.1 ppg mud and the pay zone is at 9,800’ TVD with reservoir pressure of 11.6 ppg. The cement is planned to cover 3,500 ft in the annulus above the casing shoe. Water used to mix cement is 8.3 ppg weight.

 cement Transition Period

 

Will the well go underbalance during the cement in transition period?

 Formation pressure at 9,800 ft

Formation pressure at 9,800 ft = 0.052 x 11.6 x 9800 = 5,911 psi

Total hydrostatic pressure in the annulus

Hydrostatic pressure of drilling mud at 6,500 ft = 0.052 x 12.1 x 6,500 = 4,090 psi

When cement in transition period, only water in cement will provide hydrostatic pressure. So we can calculate hydrostatic pressure of water in cement

Hydrostatic pressure of water in cement = 0.052 x (9800 – 6,500) x 8.3 = 1,424 psi

While cement is in the transition period, total hydrostatic pressure in the annulus is equal to hydrostatic pressure of mud plus hydrostatic of water in cement

Total hydrostatic pressure in the annulus = 4,090 + 1,424 = 5,514 psi

 cement Transition Period 2

You will see that during the transition period total hydrostatic pressure in the annulus is less than formation pressure therefore the well. For this case, the well will flow during transition period.

 cement Transition Period 3

 

 

Ref books: Cementing Technology Books

Drilling Formula BookFormulas and Calculations for Drilling, Production and Workover, Second Edition

Related Post

Deepwater Horizon Incident VDO Transocean demonstrates an excellent animated video of the Deepwater Horizon incident. This video will show you what was happened to the Deepwater Hor...
5 Largest Offshore Structures (Rig and Production ... Offshore structures (rig and production platform) are complex facilities to drill wells (options) and produce gas from wells from offshore locations. ...
Top 10 Major Oil Companies In The World My friend collect the interesting information about top 10 major oil companies in the world. These companies are world wide and lead in technology and...
Concrete Gravity Structures – Offshore Struc... As the name suggests, the concrete gravity structure is reliant on its own weight, and the capability of the seabed to maintain that weight, in order ...
Share the joy
  • 420
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    420
    Shares
Tagged , , . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

2 Responses to Cement Transition Period in The Oil Well Can Cause Well Control Situation

  1. Mufti says:

    Nice sharing you got here, really help me to understand flow after cement job while check valves on shoe is fails, can I use it on my writes ?
    I’ll entitled your website for my writes

    Regards

    Mufti Ghazali

  2. Monir says:

    Excellent example of under balance situation while WOC

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.