Hard Shut-In Procedure while Drilling with a Subsea BOP Stack

Nowadays, deepwater drilling is one of the important parts of drilling in the world and there are a lot of ongoing deepwater operations. Our team will start focus on subsea well control and this topic is about hard shut in procedure while drilling with a subsea stack. This is quite similar to surface stack but it is quite tricky how you space out the well properly because the BOP is way down below approximately thousand feet from sea surface.

Shut-In Procedure while Drilling with a Subsea BOP Stack

There are 3 steps which are space out, shut down and shut in and the details for the procedure are below.

1st step: Space Out

  • Stop drilling, pick up off bottom and space out to ensure that the tool joint will not be located across the BOP. Personnel need to pre calculate where to space out because the position on the rig floor will affect where the tool joint down hole.

2nd step: Space shut down

  • Shut down pumps

3rd step: Shut-in the well

  • Shut the well in on the top most BOP as annular preventer first and then open the upper choke valve against a fully closed choke manifold valve.
  • Confirm well is properly shut in and double check line up.  Check the accumulator unit to ensure that there is no leakage after closure of the BOP.
  • Inform rig supervisors and start record data as pit gain, Shut In Casing Pressure, Shut In Drill Pipe Pressure.

Reference books: Well Control Books

Related Post

Stripping Procedure with Volumetric Control For Mi... With gas kick in the well, the conventional stripping method is not application because it won’t account for the gas migration and expansion; therefor...
What is Tertiary Well Control? Can you imagine if primary and secondary well control are failed? Well is flowing all the time so how can we deal with this situation? For this situat...
Possible Kick (wellbore influx) Indications Part2 This is the second part of the possible kick indications that I would like to share with you. Decrease in d-Exponent Value Normally, trends of d...
Well Control and Blow Out !!! Many people ask us every time about well control but many of them understand that well control is when the rigs are burn. This is not the right concep...
Share the joy
  • 122
  •  
  • 1
  •  
  •  
  •  
  •  
  •  
  •  
    123
    Shares
Tagged , , , . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

One Response to Hard Shut-In Procedure while Drilling with a Subsea BOP Stack

  1. sheraz says:

    very good informative and helpful.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.