Summary of Driller’s Method

I would like to summarize about driller’s method with these simple steps as listed below;

1. Shut in the well and get pressure data (casing pressure and drill pipe pressure). The float bumping procedure may be conducted depending on whether you have a float in the drillstring or not.

2. Perform the well control calculations

3. Establish Circulation as per driller’s method

Fist circulation of Driller’s Method

a. Bring the pumps up by holding casing pressure constant

b. Circulate out the influx by holding drill pipe pressure constant

c. Shut down pumps by holding casing pressure constant

Second circulation of Driller’s Method

d. Raise mud weight up to desired kill mud weight

e. Bring the pumps up to speed by holding casing pressure constant

f. Circulate kill mud to the bit by holding casing pressure constant

g. Switch to hold drill pipe pressure

h. Circulate kill mud to surface by holding drillpipe pressure constant

i. Ensure that kill mud is all around by measurement, not by calculated stroke counts

j. Shut down pumps by holding casing pressure constant

k. Check casing pressure and drill pipe pressure. Both pressures must be 0 psi. You may see trapped pressure so as to make sure this is the trapped pressure, bleed pressure in small amount and observe pressure. Pressure should not increase after bleeding off. If pressure is building back after bleed off, there is still kick in the wellbore. You need to circulate more or raise the mud weight

Driller’s Method Rules

I also would like to emphasize these two vital rules of driller’s method that you need to keep in your mind all the time.

1st rule: Anytime you do something with pumps as start, stop or change pump speed, you must always hold casing pressure constant. This is very important.

2nd rule: For all other times, you always hold the side that has constant fluid density.

Reference book: Well Control Books

Related Post

How does the 0.052 constant come from? In the hydro-static pressure formula, if you use an oil field unit, you must see the hydro-static formula like this Pressure, psi = 0.052 x Mud Wei...
Hole Monitoring Procedures While Drilling or Milli... This is the example of hole monitoring procedure while drilling or milling and this will give you some ideas only. You need to adjust it to suit with ...
Post Shut-In Procedures While Tripping -What data ... After you complete shut in procedure while tripping, there is following information that must be recorded before making any decision on how to kill th...
Kick Prevention for Horizontal Wells After we’ve learnt several topics in regard to horizontal well control, today we will talk about how to prevent well control situation both while dril...
Share the joy
  • 5
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    5
    Shares
Tagged , . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

3 Responses to Summary of Driller’s Method

  1. noelia says:

    ta buenoooo

  2. joe garcia says:

    What are the procedures for a hard shut in?