Well Control Tracking Sheet

I just create the well control tracking sheet (well control time log) that you can use it to record what actually happen while performing well control operation. This is the updated version 2013.

Download here >> the well control tracking sheet

The logging sheet is consisted of 16 columns as listed below:

well control tracking sheet

Time, Pump Speed (SPM), Cumulative Strokes Pumped, Choke Position, DPP (drill pipe pressure), CPP (casing pressure), MW in, MW out, Mud logger, PIT Volume, Rig PIT Volume, Gas (unit of gas), Gain/Loss, Mud Logger Trip Tank Volume, Rig Trip Tank Volume, and Remarks.

You can modify to suit to your operation 🙂

I wish you would enjoy the well control tracking sheet.

Well Control Books

Related Post

PTTEP Australia Successfully killed the leaking we... This Tuesday, Nov. 3, 2009, image provided by PTTEP Australasia shows the West Atlas oil rig after a fire on it was put out 150 miles (250 kilometer...
Driller’s Method Quiz No. 4 Let's have one more test in order to remind you about the first circulation of driller's method. When you shut the well in, you record these follow...
Maximum surface pressure from kick tolerance facto... You have learned about the kick tolerance factor from the previous blog posting and this article will demonstrate you how to use the kick tolerance fa...
Stripping with Volumetric Control Steps and Exampl... This example demonstrates the calculations and the steps of the stripping with volumetric control so it will help you understand about what calculatio...
Share the joy
  • 27
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    27
    Shares
Tagged , . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.