What factors must be considered when designing a casing/tubing string?

Casing and tubing selection are one of the critical tasks that engineers must carefully decide which type of casing/tubing will be used in the wellbore in order to meet the objective of each well.  I would like to share my knowledge about the selection criteria for casing/tubing string design.

Oilfield Tubing

Oilfield Tubing

The factors must be contemplated when designing a casing and/or tubing string as listed below;

• Reservoir fluid type (oil, gas, or combine)
• Depth of casing and tubing string
• Formation Pressure gradient and fracture gradient
• Reservoir temperature
• How much reserves of reservoir
• How long of production life of wells
• Economic consideration
• Strategy of completion technique as conventional completion, monobore completion, monobore horizontal completion, etc.
• Production plan as production rate, how plateau rate be maintained, secondary recovery plan, etc.
• Bottom hole reservoir pressure and expected surface pressure during future production plan
• Level of sour gas as H2S and CO2
• Hydrocarbon zones are required to be covered by cement
• Tubing size needed to achieve production and stimulation plan
• Artificial lift equipment requirements
• Future workover plan
• Physical property of material
• Clearances needed for fishing
• Type of connection

If you have any more considerations, please feel free to share : )


Related Post

Oil Field Conversion Part 1 – Area, Circulat... Working in the oil filed, you may need to convert some unit values to another unit valves.  I have some conversion unit specially used in the drilling...
Baker Hughes To Cut Pay In Effort To Avoid More Jo... Houston-based Baker Hughes Inc. plans to begin a temporary furlough program for some employees. “In response to challenging industry conditions, Bake...
Driller’s Method Quiz No. 3 Before starting 1st circulation of driller's method, you have this following information Original Shut in Drill Pipe Pressure = 500 psi Shut in ca...
Manifa Oilfield – Heavy Crude Field, Saudi A... Saudi Arabia has the second largest oil reserves in the world, so it is quite logical that there are several successful oil companies in this country....
Share the joy
  • 28
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    28
    Shares
Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

One Response to What factors must be considered when designing a casing/tubing string?

  1. pooran singh says:

    i like it.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.