What is Secondary Well Control?

Referring to the previous section, primary well control is hydrostatic pressure bore that prevents reservoir influx while performing drilling operations (drilling, tripping, running casing/completion, etc). When primary well control is failed, it causes kick (wellbore influx) coming into a wellbore. Therefore, this situation needs special equipment which is called “Blow Out Preventer” or BOP to control kick.

BOP2

Blow Out Preventer

We can call that “Blow Out Preventer” or BOP is Secondary Well Control. Please also remember that BOP must be used with specific procedures to control kick such as driller method, wait and weight, lubricate and bleed and bull heading. Without well control practices for using BOP’s, it will just be only heavy equipment on the rig.

There are several types of “Blow Out Preventer” (BOP) which have different applications. we will talk about BOP categories later.

Reference book: Well Control Books

Please follow and like us:
0

Related Post

Shell has started production from the world’s deep... Shell has started production from the Stones development in the Gulf of Mexico, the world’s deepest offshore oil and gas project. When fully ramped...
The Deepwater Horizon Got Explosion and Fire ̵... I just saw NEWS from the TV showing The Deepwater Horizon Got Explosion and Fire - 12 People Missing. Read news below. I wish they will find those peo...
D Exponent Calculation D exponent is an extrapolation of drilling parameters to get a trend while drilling into over-pressured zones. Usually, mud logger will correct all da...
Pipe Line S-Lay Method S-lay method is the oldest and the most commonly used method for offshore pipeline installation. This is named as “S-lay” because the shape of the pip...

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.
Tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *