Angle Averaging Method in Directional Drilling Calculation

You can calculate North, East and TVD between directional surveys based on the Angle Averaging Method as per formula below:

directional survey photo

angle averaging method

Where;

MD = measured depth between surveys in ft

I1 = inclination (angle) at upper survey in degrees

I2 = inclination (angle) at lower in degrees

Az1= Azimuth direction at upper survey

Az2 = Azimuth direction at lower survey

Calculation example for Angle Averaging Method

Survey 1

Depth = 7500 ft

Inclination = 45 degree

Azimuth = 130degree

Survey 2

Depth = 7595 ft

Inclination = 52 degree

Azimuth = 139 degree

angle averaging method number

As per formula above,

North = -49.87 ft

East = 50.74 ft

TVD = 62.95 ft

Please find the Excel sheet used for directional survey calculation with Angle Averaging Method


Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition

Directional Drilling Books

Determine how many feet of free pipe without free pipe constant table

You may sometimes find the table for Free Point Constant for your stuck pipe calculation so you use the formula from the previous post to determine Free Point Constant and apply it into free pipe formula to determine where the depth of stuck pipe is.

Stuck Pipe Calculation - Stuck Depth

Stuck Pipe Calculation – Stuck Depth

The steps of calculation are as follows:

1 ) Determine the free point constant (FPC) by this following formula:

FPC = As x 2500

where: As = pipe wall cross sectional area, sq in.

As = (OD2-ID2) x 0.7854

OD and ID are inch unit

2) Determine depth of stuck pipe by this following formula:

Depth of stuck pipe = (Pipe stretch in inch x free point constant (FPC)) ÷ Pull force in thousands of pounds

Please see the example below to demonstrate you how to apply those 2 formulas above into real drilling operation.

Example#2: Determine the free point constant (FPC) and the depth the pipe is stuck using the following information:

3-1/2” tubing # 9.5 lb/ft

3-1/2” tubing ID = 2.992 inch

20 inch of stretch with 25 Klb of pulling force

a) Determine free point constant (FPC):

FPC = (3.52 – 2.9922) x 0.7854 x 2500

FPC = 6475.5

b) Determine the depth of stuck pipe:

Feet of free pipe (ft) = (20 inch x 6475.5) ÷ 25

** 25 is the kilo-force to pull to 20 inch **

Feet of free pipe (ft) = 5,180 ft

Please find the Excel sheet used for calculating depth of stuck pipe.

Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition


Determine free point constant (FPC)

Referring to the previous post, it is difficult to find drill pipe stretch table or there is no data available for you when you are really need it. This post will show you how to calculate free point constant (FPC) based on cross section of drill pipe, tubing or any cylindrical objects.

The free point constant (FPC) formula for any type of steel drill pipe is listed below:

FPC = As x 2500

where: As = pipe wall cross sectional area, sq in.

As = (OD2-ID2) x 0.7854

This method requires outside diameter and inside diameter data.

Example#1: Determine free point constant (FPC) of 4 in. drill pipe 14.0 lb/ft, inside diameter of drill pipe = 3.34 inch.

FPC = (42 – 3.342) x 0.7854 x 2500

FPC = 9512

Please find the Excel sheet to calculate free point constant.

Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition