Leak Off Test (Procedures and Calculation)

Leak Off Test is conducted in order to find the fracture gradient of certain formation at casing shoe depth. The results of the leak off test also dictate the maximum equivalent mud weight that should be applied to the well during drilling operations.

Oilfield Unit

Leak Off  Test pressure in mud density

Leak off test in equivalent mud weight = (Leak Off Test pressure ÷ 0.052 ÷ Casing Shoe TVD ) + (Current Mud Weight)

Where;

Leak off test in equivalent mud weight in ppg

Leak Off Test pressure in psi

Casing Shoe TVD in ft

Current Mud Weight in ppg

Note: Always round down for LOT calculation

Example:

Leak off test pressure = 1,600 psi
Casing shoe TVD = 4,000 ft
Mud weight = 9.2 ppg
Leak off test in equivalent mud weight (ppg) = (1,600 psi ÷ 0.052 ÷ 4,000 ft )+ 9.2ppg  = 16.8 ppg

Metric Unit

Leak Off  Test pressure in mud density

Leak off test in equivalent mud weight  = (Leak Off Test pressure ÷ 0.00981 ÷ Casing Shoe TVD ) + (Current Mud Weight)

Where;

Leak off test in equivalent mud weight in kg/m3

Leak Off Test pressure in KPa

Casing Shoe TVD in m

Current Mud Weight in kg/m3

Note: Always round down for LOT calculation

Example:

Leak off test pressure = 1,740 KPa
Casing shoe TVD = 1,300 m
Mud weight = 1,100 Kg/m3
Leak off test in equivalent mud weight (Kg/m3) = (1,740 KPa ÷ 0.00981 ÷ 1,300 m)+ 1,100 Kg/m3 = 1,236 Kg/m3

Leak Off Test (LOT) guide line procedures are as follows  (note: this is just only guide line).

You may need to follow your standard procedure in order to perform leak off test):

1.Drill out new formation few feet, circulate bottom up and collect sample to confirm that new formation is drilled to and then pull string into the casing.

2.Close annular preventer or pipe rams, line up a pump, normally a cement pump, and circulate through an open choke line to ensure that surface line is fully filled with drilling fluid.

3.Stop the pump and close a choke valve.

4.Gradually pump small amount of drilling fluid into well with constant pump stroke. Record total pump strokes, drill pipe pressure and casing pressure. Drill pipe pressure and casing pressure will be increased continually while pumping mud in hole. When plot a graph between strokes pumped and pressure, if formation is not broken, a graph will demonstrate straight line relationship. When pressure exceeds formation strength, formation will be broken and let drilling fluid permeate into formation, therefore a trend of drill pipe/casing  pressure will deviate from straight line that mean formation is broken and is injected by drilling fluid. We may call pressure when deviated from straight line as leak off test pressure.

5.Bleed off pressure and open up the well. Then proceed drilling operation.

Note:  the way people call leak off test pressure depends on each company standard practices.

Please find the Excel sheet to calculate leak off test

Ref books: Lapeyrouse, N.J., 2002. Formulas and calculations for drilling, production and workover, Boston: Gulf Professional publishing.

Bourgoyne, A.J.T., Chenevert , M.E. & Millheim, K.K., 1986. SPE Textbook Series, Volume 2: Applied Drilling Engineering, Society of Petroleum Engineers.

Mitchell, R.F., Miska, S. & Aadny, B.S., 2011. Fundamentals of drilling engineering, Richardson, TX: Society of Petroleum Engineers.

Tagged . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

15 Responses to Leak Off Test (Procedures and Calculation)

  1. Rufor says:

    Hello,
    https://www.drillingformulas.com – da best. Keep it going!

    Thanks
    Rufor

  2. kumaran says:

    thanks for wonderful explanation

  3. Janusz Danda says:

    Many thanks!

  4. Danny boy says:

    hi there ! in your example you do have 1600 psi given for leak off test pressure.
    If you don’t have the given 1600 psi., How will you able to calculate the leak off test and get the result for maiximum allowable mud density? I’am confused because Leak off test pressure is one component for getting maximum allowable mud weight..I hope you understand my query or question.Your answer will help me a lot..thank you so much !!!

  5. Loyai alshafte says:

    I study at Tripoli university and I have to make a presentation about leak off test and i got a clear information on your website thank you so much

  6. jim says:

    Is there any way to calculate LOT if you have FIT ? or any other way to find an estimate of LOT (value) ?

  7. s.alba says:

    Hi there,

    Is this pressure (1600psi) obtained at the shoe or at surface? I am having problems with that. If I have a leak off pressure at surface of 1600 psi calculated using a 10.5ppg mud, in order to calculate the break down pressure at casing shoe (i.e 7000 ft) should I use the following formula?

    Break down pressure = LOP at surface + (0.052x7000x10.5) = 1600 + (0.052x7000x10.5)

    Thanks in advance and congrats for this website!!

  8. prince says:

    when calculating total break down pressure,do i use total depth of well or depth of casing shoe

  9. Ahmad says:

    Can we pump water to do the LOT?

  10. Bill Ato Boison says:

    Nice piece

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.