Balanced Tangential Method Calculation

I have some directional calculations that I’ve shared with you. However, some of them are not shared yet so I will try to share all directional drilling formulas that may be helpful for you in the future.

Today, I would like to show you about Balanced Tangential Method Calculation. This calculation method treats half of the measured distance (MD/2) as being tangent to I1 and Az1 and the remainder of the measured distance (MD/2) as being tangent to I2 and Az2.

Continue reading

Lag Time and Its Importance for Well Control Operation

Drilling personnel need to fully understand about the lag time. Lag time is time delay from pressure adjustment made on a choke valve or a choke HCR to show up on the drill pipe pressure gauge.

Does it sound confuse? Let’s me explain more about it. When you adjust a choke position, you will not be able to see changes on the drill pipe gauge right away because drilling fluid is compressible so you need to be patient and wait a little bit until you see the changes on the drill pipe gauge.

Continue reading

Driller’s Method in Well Control

Driller’s method is one of several methods to kill the well. The main idea of driller method is to kill the well with constant bottom hole pressure. The Driller’s Method of well control requires two complete and separate circulations of drilling fluid in the well.

The first circulation removes influx with original mud weight.

When starting to bring pumps up to speed, casing pressure must be held constant until kill rate is reached. Then drillpipe pressure is held constant to maintain constant bottomhole pressure which is normally equal to, or slightly greater than pore pressure. Drillpipe pressure will be held constant until influx is removed from annulus. If the wellbore influx is gas, it will expand when it comes close to surface therefore you will see an increase in pit volume and casing pressure. Continue reading