Basic Knowledge of Jacking Operation for Jack up Rigs

Jacking, which is one of operation modes for jack up, is a specific way to raise up a hull of a jack up rig so this article will describe about the basic of jacking and preloading operation.

Jacking Operation

Mat jack up units (figure 1) jack the mat to the seabed, in accordance with the ballasting procedure. When the mat is fully lowered, the hull is then jacked out of the water. After this is complete, the unit will then proceed to preload operations. It is vital that all independent leg units also perform preload operations before being jacked to the design air gap. The majority of independent leg units lack the capacity needed to fully elevate the Jack Up unit while the preload weight is still aboard. In these cases, the next step will be to jack the hull out of the water until a very small air gap is achieved- this should be at the very most 5 feet. Once this has been reached, then preload operations can continue.

Figure 1 - Mat Footing Jack Up Rig

Figure 1 – Mat Footing Jack Up Rig

Continue reading