Basic Knowledge of Jacking Operation for Jack up Rigs

Jacking, which is one of operation modes for jack up, is a specific way to raise up a hull of a jack up rig so this article will describe about the basic of jacking and preloading operation.

Jacking Operation

Mat jack up units (figure 1) jack the mat to the seabed, in accordance with the ballasting procedure. When the mat is fully lowered, the hull is then jacked out of the water. After this is complete, the unit will then proceed to preload operations. It is vital that all independent leg units also perform preload operations before being jacked to the design air gap. The majority of independent leg units lack the capacity needed to fully elevate the Jack Up unit while the preload weight is still aboard. In these cases, the next step will be to jack the hull out of the water until a very small air gap is achieved- this should be at the very most 5 feet. Once this has been reached, then preload operations can continue.

Figure 1 - Mat Footing Jack Up Rig

Figure 1 – Mat Footing Jack Up Rig

Continue reading

Wireline Tool for Fishing Operation (Video Training)

One of the advantages of wireline tool is to be used as a part of finishing operation. This video provided by Weatherford will guide you to understand about wireline tools and their functions in the fishing operation. We also include the full vdo transcript in order to assist learning of people in our industry as usual.

Continue reading

Good Document – An Introduction to Oil & Gas Drilling and Well Operations

One of my friends shares this slide, An Introduction to Oil & Gas Drilling and Well Operations. This slide is the educational material from the IOM3 Oil and Gas Division, UK (http://www.iom3.org/). This is show all the basic of drilling and well operation in very simple language term. Additionally, there are several images which help explain content in this document clearly. This is a very good document when you try to explain overall drilling and well operation to new team members who don’t have much oilfield experience. The subjects covered in this presentation are as follow;

•Why we drill wells
•The well life cycle
•UK Legislation
•Well construction:-
−Well design and construction
−Rig types
−Pipe handling and the drill string
−Drilling and drill bits
−Drilling fluid
−Cementing (including plugging and abandonment)
−Blowout preventer
−Directional drilling
•Well testing and evaluation
•Well completion
•Xmas tree
•Well intervention
•Well integrity

Some of contents are shown below;

Continue reading