After we publish this article “Hard Shut-In Procedure while Drilling with a Subsea BOP Stack”, there are some people asking us about what about the shut-in procedure while tripping with a subsea stack. So today we will focus on this topic.
For the shutting in procedure with subsea stack, there are 3 steps which are stab valve, space out, and shut in and the details for the procedure are below.
1st step: stab valve
- Stab the full opening safety valve into the string and then make it up to the drillstring. Close the valve.