This section will show to how to use the formula from the previous topic, surge and swab pressure calculation 2nd method , to determine surge and swab pressure. I still use the same parameters as I used for the first method of surge and swab pressure calculation so you can compare the result between method#1 and method#2.
The well information is listed below:
θ300 = 85
θ600 = 130
Hole diameter = 9 inch
Drill Collar = 6.25 inch
ID of drill collar = 2.5 inch
Drillpipe diameter = 5 inch
ID of drill pipe = 3.5 inch
Average pipe running or pulling speed = 250 ft/min
Drill Pipe Length = 12000 ft
Drill Collar Length = 800 ft
Current Mud Weight = 12.5 ppg
Well TVD = 9000 ft