A deadline anchor on an oil rig is a critical component used to secure the deadline, which is the non-moving end of the drilling line in a drilling rig system. This piece of equipment ensures the stability and proper tension of the drilling line, which loops around the drawworks (the primary hoisting machinery) and the traveling block (the movable pulley system).
Categories
Search on Drillingformulas.com
Custom SearchWell Control One Page
Drillingformulas.com on Facebook
Recent Comments
- DrillingFormulas.Com on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
- PARTTY on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
- DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
- DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
- DrillingFormulas.Com on Volumetric Well Control – When will we need to use it?