Mono Trip Gas Lift (MTGL) Completion is an advanced well completion technique introduced by Baker Hughes, designed to significantly improve the efficiency and reduce cost of gas lift operations. In traditional gas lift completions, multiple trips in and out of the wellbore are required to install the lower and upper completion equipment. The MTGL completion technique simplifies this process by allowing the installation of the entire gas lift system and a packer in a single trip. Additionally, cementing operations, packer setting, and cleaning operations can all be done offline once the rig skids off to another well. This application drastically reduces well costs. The MTGL completion is particularly well-suited for small reservoir fields or brownfields where well economics are very low. With traditional completion techniques, the well cost would be so high that development of the field would not be economical.
Categories
Search on Drillingformulas.com
Custom SearchWell Control One Page
Drillingformulas.com on Facebook
Recent Comments
- DrillingFormulas.Com on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
- PARTTY on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
- DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
- DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
- DrillingFormulas.Com on Volumetric Well Control – When will we need to use it?