• About This Blog
  • Contact Us
  • Privacy Policy
Drilling Formulas and Drilling Calculations
Facebook Twitter LinkedIn Instagram RSS
  Menu
Skip to content
  • About This Blog
  • Contact Us
  • Privacy Policy

Tag Archives: Space out for well control

Space out for well control – VDO

By DrillingFormulas.Com | February 17, 2011 - 9:04 am |August 9, 2011 Oil Field Knowledge, Oil Field Videos, Well Control
Leave a comment

Space out means that you locate your drill string at the proper location where all the BOP rams (annular and pipe rams) will not close against a tool joint. Learn about space out via this VDO.

Tagged Space out for well control, Well Control
  • Categories

  • Search on Drillingformulas.com

    Google
    Custom Search
  • Well Control One Page

    Well Control One Page

  • Drillingformulas.com on Facebook

  • Recent Comments

    • DrillingFormulas.Com on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
    • PARTTY on Different Types of API Ring Gaskets Used in Well Control Equipment, Wellhead, Riser, and Xmas Tree
    • DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
    • DrillingFormulas.Com on Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel
    • DrillingFormulas.Com on Volumetric Well Control – When will we need to use it?
Drilling Formulas and Drilling Calculations | Powered by Mantra & WordPress.
Facebook Twitter LinkedIn Instagram RSS