Well Control Formulas Part 5

This part of well control formula series (part#5) will show you following equations: mud increment for volumetric, lube increment for lubricate and bleed, bottle capacity required for koomey unit, volume of usable fluid,  and snubbing force for snubbing operation. Later on, I will show you how to apply equations to particular situation. Anyway this is part 5 and total will be 8 parts.

Mud Increment for Volumetric Method (MI), bbl


Lube Increment for Lubricate and Bleed Method (LI), bbl

Continue reading

Well Control Formulas Part 4

I added some formulas that you must use in the event of well control situation.  Well control formulas part 4 consists of Height of Influx, rate of gas migration, Barite Requirement For Weight-up ,Volume Gain From Slug, Triplex Pump Output, Pump Output, Pump Pressure With New Pump Strokes, and Boyle’s Law

I will keep updating good well control formulas for you. I wish you would enjoy learning about well control formulas.

Height of Influx, ft


Approximate gas migration rate, ft/hr


Sacks of Barite Required For Weight-up, sx

Continue reading

Well Control Formulas Part 2

These are some formulas used in well control operation. I will spit all content into several parts ^_^

Equivalent Circulating Density (ECD) , ppg

Equivalent Circulating Density (ECD) ,ppg = (annular pressure loss, psi) ÷ 0.052 ÷ true vertical depth (TVD), ft + (current mud weight, ppg)

Leak-off Test Equivalent Mud Weight (LOT), ppg

Leak off test (ppg) = (Leak off test pressure in psi) ÷ 0.052 ÷ (Casing Shoe TVD in ft) + (Mud Weight used for LOT in ppg)

Maximum Initial Shut-In Casing Pressure (MISICP), psi

This calculation is based on shoe fracture which is equal to Leak Off Test Pressure.

MISICP (psi) = [LOT (ppg) – Current Mud Weight (ppg)] x 0.052 x Shoe TVD (ft)

Kill Mud Weight to Balance Formation (KMW), ppg

KWM (ppg) = [Shut In Drill Pipe Pressure (SIDP), psi ÷ (0.052x True Vertical Depth (TVD) of the well, ft)] + Original Mud Weight (ppg)

Slow Circulation Rate (SCR), psi

SCR (psi) = Initial Circulating Pressure (psi) – Shut In Drill Pipe Pressure (psi)

Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition
Well Control Books

Well Control Formulas Part 1

I would like to share with you about well control formulas that might be advantageous for you in the future. I seperate into several parts for you to easy to follow.

Before going into all calculations, I would like to emphasize about rounding rules that we will use for well control calculation.

1. Kill Mud Density: We must round up to one decimal place from a calculated kill mud density. For example, if we have the calculated kill mud density of 13.32 ppg, we will round it up to 13.4 ppg.

2. Leak Off Test (LOT): We must round down to one decimal place from a calculated Leak Off Test value. For example if we have the theoretical LOT of 15.57 ppg, we will round down to 15.5 ppg.

When any of the above values have been calculated, the rounded numbers must be used in subsequent calculations.

Well Control Course Equations Part 1

Pressure (P) – psi

Pressure (psi) = Force (lb) / Area in Square Inch (in 2)

Pressure Gradient (G) – psi/ft

Mud Gradient ( Psi/ft ) = Mud weight ( PPG) x 0.052