Shut-In Procedure while Tripping

Tripping out of the hole is a critical operation, which drilling team must keep close eye on well control situation that can occur anytime. Wellbore monitoring and hole filling equipment and must be working properly so that the kick can be quickly detected. You must be aware of and prepared for the well control situation every tripping operation.

While tripping, it can cause swabbing effect that may allow formation fluid entering into wellbore. The well may not start to flow since the swabbing effect is just started. The swabbing effect will result in reducing the overall hydrostatic pressure. If the well is continually swabbed-in until the hydrostatic pressure in the wellbore less than formation pressure, the well will start flowing. Any time that you see short fill while tripping out, you need to go back to bottom and circulate bottom up to confirm wellbore condition.

When the well control situation is happened during tripping operation, the drilling crew must shut the well in right away using the following “3 S” shut-in procedures.

Stab Valve: Install Full-Open Safety Valve (FOSV) that must be in an open position in drill string. Make up to drilling string and close the safety valve.

Space Out: Space out to ensure that tool joint must no locate in BOP element.

Shut-in well: Close the annular preventer or uppermost pipe rams. Open the upper choke line valve against a fully closed manifold valve at a choke manifold. Line up to trip tank to confirm that the well is shut-in and flow has been stopped.

Reference book: Well Control Books

Related Post

What is Secondary Well Control? Referring to the previous section, primary well control is hydrostatic pressure bore that prevents reservoir influx while performing drilling operatio...
Lubricate and Bleed Example Calculations This example demonstrates the calculations and the steps of lubricate and bleed which will help you understand about what calculations according to lu...
Blow Out Preventer (BOP) Equipment VDO Training BOP equipment is one the most critical equipment for well control operation. Learning about it via VDO training is a good way to understand this subje...
How wait and weight method controls bottom hole pr... This topic will explain you how wait and weight well control controls bottom pressure constant. There are 2 steps that must be took into consideration...
Share the joy
  • 1
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
    1
    Share
Tagged . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.