Why Slug Does Not Work?

Slug is typically used to push mud in the drill string down therefore pipe will dry while pulling out of hole. Dry pipe while pulling out has some advantages as minimizing crew to expose to drilling mud when breaking a connection, reducing time to handle the drill string, etc. Sometimes, even you already pump slug but you still have wet pipe instead of dry pipe. You may wonder why the slug does not work very well.

The following reasons why the slug does not do its job are as follows:

 

• Slug volume is not enough to slug the pipe. Recommended volume is around 25- 40 bbl.

• You should chase slug by pumping mud at least surface volume from mud pump to a rotary table. Otherwise, you will not get desired slug volume in the drillstring because it is still left in the surface volume.

• Weight of slug is not sufficient. As a normal practice, the slug weight should have at least 2 ppg over your current mud weight.

• There is something inside the drill string so the slug could not push mud in the drill string down.

 

If you want to learn more about slug, please read the following articles:

What is slug mud? How much volume and weight of slug mud should be?

Barrels of slug required for desired length of dry pipe

 

 

Backreaming practice helps smoothen the well bore

While you are sliding with a motor assembly, you may consider backreaming one time at least. The reason is that you will smoothen the well bore and it will help you when you run casing/completion or when you trip back in hole with another BHA.

Image from the internet

Continue reading

What are the differences between steering (orienting or sliding) and rotating?

Steering (orienting or sliding) is drilling with mud downhole steerable mud motor. Drilling with the steerable motor does not rotate drill pipe because it uses hydraulic power to drive down hole motor and bit. Steering is used in order to control well direction.

Rotating is drilling with Topdrive or rotary table and drillstring is rotated in order to gouge the hole. Rotary drilling will be used when straight hole direction is needed.

Comparing between steering and rotating, steering can create dog leg more than rotating because mud motor incorporating with bend housing is designed to directionally drill to the specified direction; however, when Rotating, BHA is stiffer and has tendency to hold the direction.

Rotating ROP is always faster than steering ROP by these following reasons:
• Friction force exerts on stable drill string when steering is always more than rotating.
• When steering, WOB is limited. Motor can be stalled or worn out if WOB excesses.
• Direction of well must be controlled carefully that means well can not be drilled faster.

Reference books: Directional Drilling Books

How to Assess Material Requirements for Drilling Operation

Drilling supervisors must be responsible for assessing material requirements for the drilling operation at a drilling rig. There are several following information that can help to assess material requirement in both short time (less than 48 hrs) and long time (next 3-5 day).

1. Drilling Operation Instruction: The drilling operation instruction is guidance for what operations will be happening in the future. Therefore, it will give people at the rig some ideas regarding what people will be needed.

2. Drilling Operation Meeting: The operation meeting is conducted everyday in order to discuss the forward plan among team members such as drilling supervisors, a drilling contractor and service companies. This meeting helps all parties at the rig to understand what drilling activities will be performed and when the operation requires the material perform jobs.

3. Forward plan sheet: The forward plan sheet contains all actions from demobilization to completion of the drilling program. It assists supervisors on the rig to estimate time for upcoming operations. Mostly, it is utilized for assessing the long time (next 3-5 days) material and people requirement.

4. Area on the rig: Operation supervisors must fully understand about available space of the rig because it is a constraint about how much equipment can be store on the rig. For instant, if the rig has small area, small set of equipment must be frequently ordered. On the other hand, if the rig area is big, a lot of drilling tools can be requested and kept on the rig.

5. Logistics: It is very important to know how the logistics work each area because it will help personnel on the rig know how long the equipment will be transferred from a wear house to a location after issuing the material.

6. Contact Warehouse: After all required materials are assessed, drilling supervisors and a material man must contact a warehouse in order to discuss with them about what the required materials are and when they should be at the rig site.

Normally, material requirement plan must be revised everyday because sometimes drilling operation is not ongoing as plan. Therefore, some equipment must be delayed or some special equipment must be urgently requested for specific drilling operation.