Overview of Land Drilling Operation VDO

This animation demonstrates how to drill an oil well on land and it takes only 1.5 minutes. The process is started from driving the conductor to completing the wells.

What will you learn from this VDO?

• Drive conductor

• Drill surface section, run casing and cement

• Install wellhead spool

• Nipple up BOP

• Drill intermediate section, run casing and cement

• Install next wellhead spool

• Nipple up BOP

• Drill production section, run production casing and cement

• Install wellhead with already included perforations and completion string (tubing and packer)

Even though the VDO miss some steps as perforating, running completion, and set packer, it still give people good idea on how the drilling work.

Tagged . Bookmark the permalink.

About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.