Mud Up Calendar Rotational Planner Sheet for Oilfield Personnel

Are you an oilfield worker struggling to keep track of your time on and off the rig? Look no further! This is a free Rig Schedule Planner which will help you. This powerful tool is designed specifically for oilfield professionals working common rotations like 7/7, 14-14, 21/21, and 28/28 schedules.

Why should you download the Rig Schedule Planner, simply called Mud up schedule?

  • Tailored for oilfield workers: Unlike generic calendar apps, our planner is built with your unique needs in mind, supporting the most common offshore rotation patterns.
  • User-friendly interface: This file is very simple to use, ensuring you can plan your schedule effortlessly without any complicated setup or learning curve.
  • Compatibility: This planner works seamlessly with the latest versions of Microsoft Excel, guaranteeing smooth operation on your desktop or laptop computer.
  • Absolutely free: This valuable file can be downloaded at no cost.
  • Improved work-life balance: By clearly visualizing your on and off periods, you can better plan your personal life, family time, and vacations around your work commitments.
  • Increased productivity: With a clear overview of your schedule, you can optimize your time both on and off the rig, leading to improved efficiency and job satisfaction.

Continue reading

Maximum influx height to equal the maximum allowable shut-in casing pressure

You know how the maximum allowable shut in casing pressure (MASICP) from the leak off test data and your current mud weight in the well. Moreover, you can use the MASICP to determine the maximum influx height that you can be able to control in the well control situation.

influx height

The following formula shows how to determine the figure:

Influx Height = MASICP ÷ (current mud gradient – influx gradient)

Continue reading

Maximum formation pressure that can be controlled when we shut the well in

You know about kick tolerance factor from previous section and you can use it to determine the maximum formation pressure which can be controlled when the well is shut in.

This equation below demonstrates you how to calculate it.

Continue reading

Drillers Method in Well Control VDO

Driller’s method is one of several methods to kill the well. The main idea of driller method is to kill the well with constant bottom hole pressure. The Driller’s Method of well control requires two complete and separate circulations of drilling fluid in the well. Learn about it via VDO multimedia.

Link from youtube >> http://www.youtube.com/watch?v=vPmKvm01-Hw