Well control with pipe off the bottom is one of the most serious well control situations because kick below a drillstring can create very complicated situations when compared to a normal well control. This article will teach you about the basic well control when the pipe off bottom.
There are several well control techniques to manage when the kick comes into the well and it is below the pipe;
- Use the Volumetric technique. The volumetric well control to let the gas migrate to surface with the bottom hole pressure nearly constant. This option is applicable when the influx is gas.
- Strip the drillstring back to the bottom. This is applicable with non-migration kicks as water and oil.
- Strip the drillstring utilizing the volumetric well control. This method can be used when you have a gas influx.
- Snub (push) the pipe against the wellbore pressure down to the bottom
- Kill the well off bottom using conventional well control methods as driller’s method and wait and weight. Typically, this is not recommended to use because you won’t get the kick out of the well and you may not be able to determine the kill weight mud correctly.