Shut in Well Procedures
The shut in procedure must be developed and practiced for every rig activity such as:
• Shut in while drilling
• Shut in while tripping
• Shut in while running casing, tubing, completion, etc.
• Shut in while performing workover operation
• Shut in while logging
• Shut in while performing drill stem test
What is the main reason why we need to have the shut in procedure and frequently practice it?