I’ve got a very funny Excel spreadsheet – Leaving Time Calculator for Oilfield Personnel. Basically, the file will plot a hump curve showing where you are in your working hitch.

Figure 1 – Leave Calculator Continue reading
I’ve got a very funny Excel spreadsheet – Leaving Time Calculator for Oilfield Personnel. Basically, the file will plot a hump curve showing where you are in your working hitch.

Figure 1 – Leave Calculator Continue reading
This is the example of hole monitoring procedure while drilling or milling and this will give you some ideas only. You need to adjust it to suit with your operation

Please watch the footage below. It was a flow back after breaking out the lubricator on the rig floor.
We don’t know full details what was happened but from what we’ve seen in this VDO, it shown that the well was flowing after the wireline operation was completed. The crew broke out the connection between the wireline lubricator and the string set on the rotary table. Few seconds after the connection was removed, the well flowed back. The flow became stronger as you can see the drilling fluid was pushed out from the drillstring quickly and the rotary table started to turn black. The lubricator was pushed by hydraulic power from the mud and it was swung around. Eventually, the crew went back to connect the lubricator to the string and the well stopped flowing. It seem like the situation was under control at the end. Luckily, there was no gas or any spark that can cause fire on the rig floor.
All drilling rigs have the Blow Out Preventer because it is a mandatory equipment for well control, therefore personnel who has work relating to drilling operation must learn about the BOP. Learning via VDO training gives you several advantages as clear descriptions with relating images, etc so learners can learn faster and get correct massage.
This VDO below teaches about the BOP and we also provide the full VDO transcript as usual to accelerate learning capability.
Bullheading is one of the well control methods that involve pumping formation fluids back into formation into a shut-in well. You can read the basic details about bullheading from this link https://www.drillingformulas.com/bullheading-well-control-method/. For this time, this article will be focused on a calculation example for bullheading operation.