About DrillingFormulas.Com

Working in the oil field and loving to share knowledge.

Oil Field Abbreviation Mostly Used in the Rig

This is may not relate to drilling formula but it may be good for new people to know about oil field abbreviations. If you have more than what I have, please feel free to add more by putting in the blog comment.

ACF – Annular Capacity Factor

AV – Annular Velocity

BF – Buoyancy Factor

BHA – Bottom Hole Assembly

BHP – Bottom Hole Pressure

BOP – Blow Out Preventor

BOPE – Blow Out Preventer Equipment

BPUTS – Bring Pumps Up To Speed

CC – Circulate and Condition mud

CLF – Choke Line Friction

CMW – Current Mud Weight

CP – Casing Pressure

DC – Drill Collar

Dh – Diameter of hole in inches

DP – Drill Pipe

DPP – Drill Pipe Pressure

ECD – Equivilant Circulating Density

EOB – End of Build

ESP – Estimated Stuck Point or Electical Submersible Pump

FCP – Final Circulating Pressure

FD – Fluid Density

FIT – formation integrity test

FOSV – Full Opening Safety Valve

FP – Formation Pressure

FrP – Friction Pressure

FV – Funnel Viscosity

GPM – Gallons Per Minute

HHP – Hydraulic Horse Power

HP – Hydrostatic Pressure

IBOP – Inside Blow Out Preventer

ICP – Initial Circulating Pressure

ISICP – Initial Shut-in Casing Pressure

KLF – Kill Line Friction

KMW – Kill Mud Weight

KOP – Kick Off Point

Lbs. – Pounds

LC – Lost Circulation

LCM – Lost Circulation Material

Len – Length in feet

LOT – Leak Off Test

MAASP – Maximum Allowable Annular Surface Pressure

MASP – Maximum Anticipated Surface Pressure

MD – Measured Depth

MGS – Mud Gas Separator

MI – Mud Increment

MISICP – Maximum Initial Shut-in Casing Pressure

MOP – Margin of Over Pull

MW – Mud Weight in ppg

NP – Neutral Point

OBM – Oil Based Mud

OMW – Original Mud Weight

OPT – Optimum

PG – Pressure Gradient

PI – Pressure Increment

POH – Pull Out Hole

PP – Pore Pressure

PPG – Pounds Per Gallon

RIH – Run In Hole

ROH – Run Out Of Hole

RPM – Rounds Per Minute

RSS- Rotary Steerible System

SCR – Slow Circulating Rate

SG – Specific Gravity

SICP – Shut-in Casing Pressure

SIDPP – Shut-in Drill Pipe Pressure

SOBM – Synthetic Oil Based Mud

SP – Surface Pressure

SPM – Strokes Per Minute

SPM Valve – Side Pocket Mandrel Valve

SPR – Slow Pump Rate

TDS – Top Drive System

TIH – Trip In Hole

TOC – Top Of Cement

TOF – Top Of Fish

TOH or TOOH – Trip Out Of Hole

TOL – Top Of Liner

TVD – True Vertical Depth

WL – Water Loss or Wire Line

WOB – Weight On Bit

WOC – Wait On Cement

WOO – Wait On Orders

WOW – Wait On Weather

YP – Yield Point

Weight of slug required for desired length of dry pipe with set volume of slug

You can determine how much slug weight required in order to achieve desired length of dry pipe with certain slug volume that you will use.

slug lenght dry pipe

Oilfield Unit

Please follow these steps of calculation below;

Step 1 Determine Length of slug in drill pipe in ft:

Length of slug in drill pipe in ft = slug volume in bbl ÷ drill pipe capacity in bbl/ft

Step 2 Determine hydrostatic pressure required to give desired dry pipe drill pipe:

Hydrostatic Pressure in psi = mud weight in ppg × 0.052 × desired length of dry pipe

Step 3 Determine slug weight needed in ppg:

Slug weight in ppg = (Hydrostatic Prำssure (from step 2) ÷ 0.052 ÷ Length of slug in ft (step1)) + mud weight, ppg, in hole

Example: Determine slug weight required for the following data:

Desired length of dry pipe = 200 ft

Mud weight in hole = 12.0 ppg

Drill pipe capacity = 0.016 bbl/ft

Volume of slug = 20 bbl

Step 1 – Determine Length of slug inside drill pipe in ft:

Slug length = 20 bbl ÷ 0.016 bbl/ft

Slug length = 1250 ft

Step 2 – Determine hydrostatic pressure required to give desired dry pipe drill pipe

Hydrostatic Pressure in psi = 12.0 × 0.052 × 200

Hydrostatic Pressure in psi = 124.8 psi

Step 3 – Determine slug weight needed in ppg:

Slug weight in ppg = (124.8 ÷ 0.052 ÷ 1250) + 12.0

Slug weight in ppg = 13.9 ppg

Metric Unit

Please follow these steps of calculation below;

Step 1 Determine Length of slug in drill pipe in meter (m):

Length of slug in drill pipe in m = slug volume in m³ ÷ drill pipe capacity in m³/m

Step 2 Determine hydrostatic pressure required to give desired dry pipe drill pipe:

Hydrostatic Pressure in psi = mud weight in kg/m³ × 0.00981 × desired length of dry pipe in m

Step 3 Determine slug weight needed in ppg:

Slug weight in ppg = (Hydrostatic Pressure (from step 2) ÷ 0.00981÷ Length of slug in m (step1)) + mud weight, kg/m³, in hole

Example: Determine slug weight required for the following data:

Desired length of dry pipe = 120 m

Mud weight in hole = 1,400 kg/m³

Drill pipe capacity = 0.007824 m³/m

Volume of slug = 4.5 m³

Step 1 – Determine Length of slug inside drill pipe in ft:

Slug length = 4.5 m³÷ 0.007824 m³/m

Slug length = 575 m

Step 2 – Determine hydrostatic pressure required to give desired dry pipe drill pipe

Hydrostatic Pressure in psi = 1,400 × 0.00981 × 120

Hydrostatic Pressure in psi = 1,648 KPa

Step 3 – Determine slug weight needed in ppg:

Slug weight in ppg = (1,648 ÷ 0.00981 ÷ 575) + 1,400

Slug weight in ppg = 1692 kg/m³

Please find the excel sheet used to calculate Weight of slug required for a desired length of dry pipe with a set volume of slug.

Ref books: 

Lapeyrouse, N.J., 2002. Formulas and calculations for drilling, production and workover, Boston: Gulf Professional publishing.

Bourgoyne, A.J.T., Chenevert , M.E. & Millheim, K.K., 1986. SPE Textbook Series, Volume 2: Applied Drilling Engineering, Society of Petroleum Engineers.

Mitchell, R.F., Miska, S. & Aadny, B.S., 2011. Fundamentals of drilling engineering, Richardson, TX: Society of Petroleum Engineers.

Barrels of slug required for desired length of dry pipe

What is slug? Slug: It is heavy mud which is used to push lighter mud weight down before pulling drill pipe out of hole. Slug is used when pipe became wet while pulling out of hole. This article will demonstrate you how to calculate how many barrel of volume slug required for desired light of dry pipe.

Normally, 1.5 to 2 PPG over current mud weight is a rule of thumb to decide how much weight of slug should be. For example, current mud weight is 10 PPG. Slug weight should be about 11.5 to 12 PPG.  Generally, slug is pumped to push mud down approximate 200 ft and slug volume can be calculated by applying a concept of U-tube (See Figure below).

Volume of slug required for required length of dry pipe can be calculated by this following equations:

Oilfield Unit

Step 1: Determine hydrostatic pressure required to give desired drop inside drill pipe:

Hydrostatic Pressure in psi = mud weight in ppg × 0.052 × ft of dry pipe

Step 2: Determine difference in pressure gradient between slug weight and mud weight:

Pressure gradient difference in psi/ft = (slug weight in ppg – mud weight in ppg) × 0.052

Step 3: Determine length of slug in drill pipe:

Slug length in ft = Hydrostatic Pressure in psi (in step 1) ÷ Pressure gradient difference in psi/ft (step 2)

Step 4: Slug volume required in barrels:

Slug volume in barrel = Slug length in ft × drill pipe capacity in bbl/ft

Example: Determine the barrels of slug required for the following:

Desired length of dry pipe = 200 ft

Drill pipe capacity = 0.016 bbl/ft

Mud weight = 10.0 ppg

Slug weight = 11.5 ppg

slug

Step 1 Hydrostatic pressure required:

Hydrostatic Pressure in psi = 10.0 ppg × 0.052 × 200 ft

Hydrostatic Pressure in psi = 104 psi

Step 2 differences in pressure gradient between slug weight and mud weight:

Pressure gradient difference in psi/ft = (11.5 ppg – 10.0 ppg) × 0.052

Pressure gradient difference in psi/ft = 0.078 psi/ft

Step 3 length of slug in drill pipe:

Slug length in ft = 104 psi ÷ 0.078 psi/ft

Slug length in ft = 1,333 ft

Step 4 Slug volume required in barrels:

Slug volume required = 1,333 ft × 0.016 bbl/ft

Slug volume required = 21.3 bbl

Metric Unit

Step 1: Determine hydrostatic pressure required to give desired drop inside drill pipe:

Hydrostatic Pressure in kPa = mud weight in kg/m³ × 0.00981 × length of dry pipe in m

Step 2: Determine difference in pressure gradient between slug weight and mud weight:

Pressure gradient difference in kPa/m = (slug weight in kg/m³ – mud weight in kg/m³) × 0.00981

Step 3: Determine length of slug in drill pipe:

Slug length in m = Hydrostatic Pressure in kPa (in step 1) ÷ Pressure gradient difference in kPa/m(step 2)

Step 4: Slug volume required in barrels:

Slug volume in m³ = Slug length in m × drill pipe capacity in m³/m

Example: Determine the barrels of slug required for the following:

Desired length of dry pipe = 120 m

Drill pipe capacity = 0.00782 m³/m

Mud weight = 1,380 kg/m³

Slug weight = 1,500 kg/m³

Step 1 Hydrostatic pressure required:

Hydrostatic Pressure in psi = 1,380 kg/m³ × 0.00981 × 120 m

Hydrostatic Pressure in psi = 1,625 kPa

Step 2 differences in pressure gradient between slug weight and mud weight:

Pressure gradient difference in kPa/m = (1,500 kg/m³ – 1,380 kg/m³ ) × 0.00981

Pressure gradient difference in kPa/m = 1.1772 kPa/m

Step 3 length of slug in drill pipe:

Slug length in ft = 1,625 kPa ÷ 1.1772 kPa/m

Slug length in ft = 1,380 m

Step 4 Slug volume required in barrels:

Slug volume required = 1,380 m × 0.00782 m³/m

Slug volume required = 10.79 m³

Please find the excel sheet used to calculate barrels of slug required for desired length of dry pipe

Ref books: 

Lapeyrouse, N.J., 2002. Formulas and calculations for drilling, production and workover, Boston: Gulf Professional publishing.

Bourgoyne, A.J.T., Chenevert , M.E. & Millheim, K.K., 1986. SPE Textbook Series, Volume 2: Applied Drilling Engineering, Society of Petroleum Engineers.

Mitchell, R.F., Miska, S. & Aadny, B.S., 2011. Fundamentals of drilling engineering, Richardson, TX: Society of Petroleum Engineers.

What does the negative vertical section mean?

Vertical Section is the horizontal distance of wellbore that moves in the direction of the target per each station or in total.  For instance, in the figure below, vertical section is the distance from survey to survey point and it’s measured in the same direction of the vertical section direction.

vertical-section-direction

The two factors that affect vertical section are as follows:

1. The Incremental horizontal displacement (? HD)

2. Vertical section direction (VSD) is the azimuth that is used to reference to the vertical section. Normally, VSD is the azimuth of the last target.

The simple mathematics as Average Angle Method calculation demonstrates the relationship of the VS as below:

VS = cos (VSD – Az avg) X ?HD

VS: Vertical Section

VSD: Vertical Section Direction

Az avg: Average Azimuth between 2 points (Az1 + Az2) ÷2

?HD: Delta Horizontal Displacement

In order to get the Positive Vertical Section or Zero Vertical Section, a well path must have difference of angle between VSD and Az avg, (VSD – Az avg), within a range of +90 to -90 degree. On the other hands, the negative Vertical Section can occur because the difference of angle between VSD and A zavg, (VSD – Az avg), is out of range of +90 to -90 degree AZI.

Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition

Directional Drilling Books

Dogleg Severity Calculation Based on Tangential Method

From the previous post, I posted about how to calculate dogleg severity based on Radius of Curvature Method. What’s more, there is another way to calculate dogleg severity based on the concept of Tangential Method.

The following formula provides dogleg severity in degrees/100 ft and is based on the Tangential Method:

Dogleg severity (DLS) = 100 ÷ {MD x [(sin I1 x sin I2) x (sin Az1 x sin Az2 + cos Az1 x cos Az2) + (cos I1 x cos I2)]}

directional survey photo

where

DLS = dogleg severity in degrees/l00 ft

MD = measured depth between survey points, ft

I1 = inclination (angle) at upper survey in degrees

I2 = inclination (angle) at lower in degrees

Az1= Azimuth direction at upper survey

Az2 = Azimuth direction at lower survey


Calculation example for dogleg severity based on Tangential Method

Survey 1

Depth = 7500 ft

Inclination = 45 degree (I1)

Azimuth = 130 degree (Az1)

Survey 2

Depth = 7595 ft

Inclination = 52 degree (I2)

Azimuth = 139 degree (Az2)

Dogleg severity (DLS) = 100 ÷ {95 x [(sin 45 x sin 52) x (sin 130 x sin 139 + cos 130 x cos 139) + (cos 45 x cos 52)]}

Dogleg severity (DLS) = 1.07 degree/100 ft

Please find the Excel sheet for calculating dogleg severity with the concept of Tangential Method

Ref book: Formulas and Calculations for Drilling, Production and Workover, Second Edition

Directional Drilling Books